Jesse Malone

VP of Operations

Personal motto: Perfect is just barely acceptable.

Coming from a background in engineering and design, Jesse previously worked on movies building special effects robotics. Recently promoted to the leadership team at JMA, he has been in the construction industry as a superintendent since 1998. His value of achieving goals and his construction experience bring to JMA a strong ability to take charge, organize and keep his team focused, resulting in projects that are completed on time.

Jesse states: “I enjoy being part of a collaborative process, as well as learning about building while learning about people. Here at JMA we are measured by our integrity, and not by our profits. Our projects require an entire team to build. The best part of what we do is standing back at the end of the day with your team and seeing what we have accomplished together.”

Outside of work, Jesse can be found outdoors enjoying mountain biking, running, and spending time with his family.

Credentials:

  • LEED BD+C

Favorite JMA Projects

  • Solage Calistoga – Spa resort with 52 cottages, restaurant, swimming pool, mud bath, gym/yoga building and spa
  • Sonoma Academy – 90,000 sf high school campus of three 2-story buildings including gym, black box theater and athletic fields
  • Healdsburg Farmhouse – 12,000 sf, 7-bedroom residence, pool, lakeside terrace and entertainment barn
  • Carneros Farmhouse – 16,000 sf combined 4-bedroom residence with pool, pool house and garage, 6,000 sf horse barn, 1,200 sf gate house with detached garage and machine shed